Median household income
<$35k $65k $95k+
ACS 2024 five-year estimates, by census tract (Tulsa County plus the
Osage County tracts inside west Tulsa) or by ZIP code. A dashed outline flags a small
population or a wide margin of error. ZIP 74117 has no published median.
Proposed for closure — click a number
Other building change — click it
Remaining district site — click it
Welcoming site — where a selected school's students would go
Every site in the proposal enrolled fewer than 400 students
with building use under 65% , and none is projected to gain enrollment. The 14
elementary sites averaged 307 students and 51.3% occupancy in 2025–26;
only Anderson and Dolores Huerta cleared 60%.
The list touches all seven school board districts and six of seven
feeder patterns. Edison is the exception: every Edison school sat at 75% occupancy or
above, two of them above 95%.
Consolidation groups
The district paired each closing school with the nearest schools that
have room (a target of 85% building use or less) and grouped them by geography. These
groups are the district's own; they cut across feeder patterns. Click a group to show only
its schools.
Feeder patterns
A feeder pattern is the set of elementary schools that send students to
one middle and high school. Click a pattern to show only its schools; a school's card shows
its current and proposed feeder. Building use is TPS's figure for the whole pattern, now
and under the proposal.
Other building changes
How sites were chosen
Three primary criteria: student enrollment, building size and use, and
student outcomes. Supporting data: enrollment trends, safe walking paths, unique programs,
student demographics and needs, retention and transfer history, travel distance, nearby
options, and physical barriers such as railroads and highways.
Boundary changes favored the shortest distance to a welcoming school
with 85% or less building use after the move, and avoided crossing railroads and major
roads.
Budget and enrollment context
The board's 27 July resolution requires at least $12 million in
savings by 19 October. The proposal counts $11.1 million from closures ($8.5 million
in staffing allocations, $2.6 million in operating costs, plus $0.9 million deferred) and
$1.5 million from central office reductions.
TPS reports enrollment down 779 students from a year earlier as of
18 September 2026, and cites an Esri projection of a 2.5% decline in children over the
next five years. It states that about 2,600 additional students would be needed to
balance the budget at current staffing levels.
Of 697 community survey responses, 65% chose fewer schools with more
consistent services over more schools with reduced services (18% more schools, 16% unsure).
Staffing ratios stay at 24:1 (K–2), 28:1 (3–5), 29:1
(middle) and 33:1 (high). Bond funds flagged for closing sites would be redirected to
receiving sites through the bond oversight committee.